Freedom! The Gazela Bridge Completes Construction

 

I took this photo Saturday evening while coming back from New Belgrade. All six lanes of traffic were open for the first time in many months as a large repair construction project was completed 7:00 PM on Saturday. The Gazela Bridge is one of the main bridges in the city connecting the old part of Belgrade with the New Belgrade. Besides being used for intra-city traffic, it is also part of two major highways crossing Europe (E70 and E75) and so besides Belgrade traffic, there is lots of foreign cars cruising through. The bridge has more cars crossing it than it was designed for.

The bridge built in 1970 was in desparate need of reinforcement and it looks and feels much better. The project did however, make everyone’s lives a hassle because of the limited options in crossing the city. Hopefully with all six lanes open, this will cut down on the traffic delays that were a daily part of many Belgraders lives.

The city is working on another bridge across the Sava River (see photo below) which should be done in the next few months. It will be interesting to see how this affects traffic flow. There are only two other bridges going across the Sava in the center part of the city. The bypass project, which would divert E70 and E75 traffic is still in the planning stages.

By the way, the name “Gazela” comes from the fact that on a side view, the bridge does look like a gazelle running.

View from the river, of the almost completed Sava Bridge (August 2011)